We are currently in production of 12 additional fiber bundles to replace bundles which are currently installed in the microscope. We found that our light guide fibers were not double clad, but were only single clad. In August and September of 2014, we received a new order of BCF-98 and BCF-20 which we verified as multi-clad using EDX techniques. In addition to having a second cladding layer, we are also attempting to maintain the optical qualities best by minimizing strain on fibers by removing some of the fiber procedures.  
+
==Summer 2017==
 +
This summer, I (Micah Warren) am constructing seven new bundles to replace old ones in the tagger microscope. The following pages provide documentation:
 +
 
 +
[[Rough Cut Documentation Summer 2017]]
 +
 
 +
[[Pockmark Documentation Summer 2017]]
 +
 
 +
==2015 and Earlier==
 +
We are currently in production of 12 additional fiber bundles to replace bundles which are currently installed in the microscope. We found that our light guide fibers were not double clad, but were only single clad. In August and September of 2014, we received a new order of BCF-98 and BCF-20 which we verified as multi-clad using [[Cladding Images|EDX techniques]]. In addition to having a second cladding layer, we are also attempting to maintain the optical qualities best by minimizing strain on fibers by removing some of the fiber procedures.  
  
 
Current progress is being kept in the [https://docs.google.com/a/uconn.edu/spreadsheets/d/1AZPVzbwDgBWl5UXUVSnz_8_0yO6rmNUTt_MeylHasTQ/ Fibers - 2015 Google Spreadsheet].
 
Current progress is being kept in the [https://docs.google.com/a/uconn.edu/spreadsheets/d/1AZPVzbwDgBWl5UXUVSnz_8_0yO6rmNUTt_MeylHasTQ/ Fibers - 2015 Google Spreadsheet].
  
 
=Procedures for Tagger Microscope Construction=
 
=Procedures for Tagger Microscope Construction=
 +
 +
Here is a master document which describes the procedures: [https://docs.google.com/document/d/15OreBfdhb5mdpdXz6KMTVQt8ZWMU-4OV9i8Y6vp97Ms/edit# Construction Plan for the Tagger Microscope]
  
 
[[Fiber Rough Cut Procedure]]
 
[[Fiber Rough Cut Procedure]]
  
[[Straightening Light Guides Procedure]]<i> Discontinued Jan 2015</i>
+
[[Fiber Numbering Procedure]]
 +
 
 +
[[Fiber Measuring Procedure]]
  
[[Fiber Cleaning Procedure]] <i> Discontinued Summer 2014 </i>
+
[[Fiber Bundling Procedure]]
  
[[End Milling Procedure]]
+
[[End Milling Procedure]] <i> Discontinued Summer 2017 </i>
  
 
[[Fiber Polishing Procedure]]
 
[[Fiber Polishing Procedure]]
Line 18: Line 30:
 
[[Fiber Fusing Procedure]]
 
[[Fiber Fusing Procedure]]
  
[[Fiber Bending Procedure]] <i> Discontinued Jan 2015 </i>
+
[[Temperature Control Program|Hot Air Bending Procedure]]
 +
 
 +
[[Fiber Testing Procedure]]
 +
 
 +
[[Hot Water Straightening Light Guides Procedure]]<i> Discontinued Jan 2015</i>
 +
 
 +
[[Fiber Water Stain Cleaning Procedure]] <i> Discontinued Summer 2014 </i>
 +
 
 +
[[Hot Water Fiber Bending Procedure]] <i> Discontinued Jan 2015 </i>
  
 
[[Fiber Painting Procedure]]<i> Discontinued May 2014 </i>
 
[[Fiber Painting Procedure]]<i> Discontinued May 2014 </i>
  
 
Fiber Gluing Procedure <i> Discontinued Spring 2014 </i>
 
Fiber Gluing Procedure <i> Discontinued Spring 2014 </i>
 
[[Fiber Testing Procedure]]
 
  
 
=A List of Specifications/Manuals for Items in Lab 405=
 
=A List of Specifications/Manuals for Items in Lab 405=
Line 30: Line 48:
 
This page has the documentation for the various procedures and pieces of equipment that are used in the bending tank, the splicing unit, and elsewhere in 405.
 
This page has the documentation for the various procedures and pieces of equipment that are used in the bending tank, the splicing unit, and elsewhere in 405.
 
[[Documents for 405]]
 
[[Documents for 405]]
 +
 +
 +
=Fiber Statistics=
 +
 +
[[Fiber Dimension Statistics]]
 +
  
 
=Miscellaneous Fiber Testing=
 
=Miscellaneous Fiber Testing=
Line 56: Line 80:
 
Fiber transmission measurements were carried out in Lab 402 using a flash ADC and a VME-based data acquisition system that was loaned to UConn by Jefferson Lab.  Our contact at Jlab for this system is Alex Somov.  Setup and operation of the CODA data acquisition platform is described [[Data Acquisition using CODA|here]].
 
Fiber transmission measurements were carried out in Lab 402 using a flash ADC and a VME-based data acquisition system that was loaned to UConn by Jefferson Lab.  Our contact at Jlab for this system is Alex Somov.  Setup and operation of the CODA data acquisition platform is described [[Data Acquisition using CODA|here]].
 
*[[Description and Layout of the VME Data Acquisition Setup]]
 
*[[Description and Layout of the VME Data Acquisition Setup]]
*[[Procedure for Operation of CODA Run Control]]
+
*[[Procedure for Operation of CODA Run Control - Fall 2013]]
 
*[[Creating/Editing mSQL Databases for CODA]]
 
*[[Creating/Editing mSQL Databases for CODA]]
 
*[http://halldweb1.jlab.org/wiki/index.php/Private:UConn_test_setup Alex Somov's instructions for running the CODA-based DAQ]
 
*[http://halldweb1.jlab.org/wiki/index.php/Private:UConn_test_setup Alex Somov's instructions for running the CODA-based DAQ]
*[[media:Jlab_VME_discriminator_manual.pdf|VME discriminator manual]]
+
*[[media:Jlab_VME_discriminatorRevD_manual.pdf|VME discriminator manual]]
*[[media:FADC250UsersManual.pdf|VME FADC250 manual]]
+
*[[media:FADC250UsersManual.pdf|VME FADC250 manual]] ([[media:FADC250_V2_ADC_FPGA_V90E.pdf|firmware update 90E]], [[media:FADC250_Processing_FPGA_Firmware_ver_0x0C01.pdf|firmware update C01]])
*[[media:Jlab_F1_TDC_manual.pdf|VME F1TDC manual]]
+
*[[media:Jlab_F1_TDC_manual.pdf|VME F1TDC manual]] ([[media:F1TDC_V2_V3_8_26.pdf|latest firmware update]])
 +
*[[media:CaenADCv792_rev18.pdf|Caen QDC v792 manual]]
 +
*[[media:TI-old-VME.pdf|VME Trigger Interface (old-style VME) manual]]
 +
*[[media:TI-new-VXS.pdf|VXS Trigger Interface (new-style VXS) manual]]
 +
*[[Operation of CODA Run Control - Fall 2015]]
 
*[http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/analyzer Analyzer] - software package that extracts pulse information from CODA data files and stores them in a root tree.
 
*[http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/analyzer Analyzer] - software package that extracts pulse information from CODA data files and stores them in a root tree.
 +
 +
=Hot Air Bending Box=
 +
After our experience with with heating fibers in water for straightening and bending, we decided to change our procedure and use hot air instead of water. The following pages show information about the heating box and the program used to run it.
 +
 +
[[Fiber Heating Box]]<br/>
 +
[[Temperature Control Program]]
 +
 +
=Intermediate Storage Box=
 +
[[Intermediate Storage Box]]
  
 
=Lab Journals / Research Progress=
 
=Lab Journals / Research Progress=
Line 114: Line 151:
  
 
[[Map of Lab 405]]
 
[[Map of Lab 405]]
 +
[Out of date as of 6/19/17]

Latest revision as of 14:35, 5 January 2018

Current Work

Summer 2017

This summer, I (Micah Warren) am constructing seven new bundles to replace old ones in the tagger microscope. The following pages provide documentation:

Rough Cut Documentation Summer 2017

Pockmark Documentation Summer 2017

2015 and Earlier

We are currently in production of 12 additional fiber bundles to replace bundles which are currently installed in the microscope. We found that our light guide fibers were not double clad, but were only single clad. In August and September of 2014, we received a new order of BCF-98 and BCF-20 which we verified as multi-clad using EDX techniques. In addition to having a second cladding layer, we are also attempting to maintain the optical qualities best by minimizing strain on fibers by removing some of the fiber procedures.

Current progress is being kept in the Fibers - 2015 Google Spreadsheet.

Procedures for Tagger Microscope Construction

Here is a master document which describes the procedures: Construction Plan for the Tagger Microscope

Fiber Rough Cut Procedure

Fiber Numbering Procedure

Fiber Measuring Procedure

Fiber Bundling Procedure

End Milling Procedure Discontinued Summer 2017

Fiber Polishing Procedure

Fiber Fusing Procedure

Hot Air Bending Procedure

Fiber Testing Procedure

Hot Water Straightening Light Guides Procedure Discontinued Jan 2015

Fiber Water Stain Cleaning Procedure Discontinued Summer 2014

Hot Water Fiber Bending Procedure Discontinued Jan 2015

Fiber Painting Procedure Discontinued May 2014

Fiber Gluing Procedure Discontinued Spring 2014

A List of Specifications/Manuals for Items in Lab 405

This page has the documentation for the various procedures and pieces of equipment that are used in the bending tank, the splicing unit, and elsewhere in 405. Documents for 405


Fiber Statistics

Fiber Dimension Statistics


Miscellaneous Fiber Testing

Below are the various tests that were conducted on the fibers to determine their durability when in contact with the alcohol that will be used to clean them. Also included are the strength tests that were conducted on the fibers that were fused with the old ferrules.

Alcohol Tests

Epoxy Tests

Strength Tests

Fiber Painting

Visual Inspection

Ferrule Measurements

In hopes of understanding the bulge in the spliced region of the fibers, the ferrules they are spliced in were photographed under a microscope and measured using a tracker program that allows for in-photo calibration and measurement. The ferrules were placed as perpendicular to the table as possible in order to get the most flat, head on shot of the ferrules. The error in the measurement of the angles was quite high. Moving the compass only a little bit (in the tracker program) lead to very different degrees read. Because of this I would estimate the angle to be off anywhere from +- 1-2 degrees. I would say that the lengths measured have an error on the order of +- .05-.1 mm

Measurement Photographs

New Ferrule Measurement Photographs

Quality Control Procedures

Fiber transmission measurements were carried out in Lab 402 using a flash ADC and a VME-based data acquisition system that was loaned to UConn by Jefferson Lab. Our contact at Jlab for this system is Alex Somov. Setup and operation of the CODA data acquisition platform is described here.

Hot Air Bending Box

After our experience with with heating fibers in water for straightening and bending, we decided to change our procedure and use hot air instead of water. The following pages show information about the heating box and the program used to run it.

Fiber Heating Box
Temperature Control Program

Intermediate Storage Box

Intermediate Storage Box

Lab Journals / Research Progress

The following page has the lab journals of Ann Marie and the undergraduate workers. Lab Journals

Past Goals and Production Documents

If you want to see our previous construction goals you can access them below.

Construction Plan for the Tagger Microscope and Active Collimator

Previous Construction Goals

List of CAD Drawings

LabView Program Explanation - This page details the work that has gone into the LabView program that was written to control the heaters and pumps for the bending tank in 405.

Temperature Measurements

This section describes the work that has gone into the construction of the thermistor for the bending tank in 405. It also has some materials devoted to describing the function and properties of a thermistor and the method used to build the one used here.

Thermistor Construction Journal

Filling Tank / Filling PVC / Water Quality Information

Important procedure to follow when filling the tank

Water Tank Instructions and Diagrams

Pictures

Water Quality Testing

Machine Shop Priorities are located here

Past Bundle Production Documents

Bundle Production Progress

Rough Cut Travelers

Fusing Statistics

Fiber Heating Data (Straightening and Bending)

Formatting Examples

Wiki Formatting Examples

Lab Maps

Map of Lab 403

Map of Lab 405 [Out of date as of 6/19/17]