Changes

Jump to navigation Jump to search
323 bytes added ,  20:30, 7 April 2014
Line 82: Line 82:  
'''Apr 1''' Today I polished Bundle 16/P light guides, placed labels on them (1-15,A-O) and measured their cross sections. I finished measuring everything that way next time I can fuse them all within an hour or so. (2.5 hours)
 
'''Apr 1''' Today I polished Bundle 16/P light guides, placed labels on them (1-15,A-O) and measured their cross sections. I finished measuring everything that way next time I can fuse them all within an hour or so. (2.5 hours)
   −
'''Apr 2''' Today I didn't come in because it's midterms week and I had to study. I did come in for the end of the weekly meeting though.
+
'''Apr 2''' Today I didn't come in because there was a university-wide emergency. I did come in for the end of the weekly meeting though. (.5 hours)
 +
 
 +
'''Apr 7''' I fused Bundle 16/P. This completes the fusing process. I measured the fuse site widths and input them into both the Fusing Statistics Google Doc and the Bundle Names Google Doc. I also finished gluing together the styrofoam bundle holders. They are all completely constructed now too. (3.75 hours)
    
==May 2014==
 
==May 2014==
578

edits

Navigation menu