==April 2014==
 
==April 2014==
   −
'''Apr 1''' Today I polished Bundle 16/P light guides, placed labels on them (1-15,A-O) and measured their cross sections. I finished measuring everything that way next time I can fuse them all within an hour or so. (2.5 hours)
+
'''Apr 1''' - Today I polished Bundle 16/P light guides, placed labels on them (1-15,A-O) and measured their cross sections. I finished measuring everything that way next time I can fuse them all within an hour or so. (2.5 hours)
   −
'''Apr 2''' Today I didn't come in because there was a university-wide emergency. I did come in for the end of the weekly meeting though. (.5 hours)
+
'''Apr 2''' - Today I didn't come in because there was a university-wide emergency. I did come in for the end of the weekly meeting though. (.5 hours)
   −
'''Apr 7''' I fused Bundle 16/P. This completes the fusing process. I measured the fuse site widths and input them into both the Fusing Statistics Google Doc and the Bundle Names Google Doc. I also finished gluing together the styrofoam bundle holders. They are all completely constructed now too. (3.75 hours)
+
'''Apr 7''' - I fused Bundle 16/P. This completes the fusing process. I measured the fuse site widths and input them into both the Fusing Statistics Google Doc and the Bundle Names Google Doc. I also finished gluing together the styrofoam bundle holders. They are all completely constructed now too. (3.75 hours)
 +
 
 +
'''Apr 8''' - Prepared Bundle N for bending (2 hours)
 +
 
 +
'''Apr 10''' - Removed Bundle N from the bending unit and cleaned each fiber with a cloth. I also cleaned the bending unit and emptied the tank so we can bend tomorrow hopefully. I also attended the weekly meeting (2.5 hours)
    