541 bytes added
, 15:04, 24 September 2012
<big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br>
<big>[[**UNDER CONSTRUCTION**]]</big>
1. Place-Holder<br>
2. Place-Holder<br>
3. Setup the CODA station<br>
4. Prototype the bias voltage compensator circuit<br>
5. Electronics boards revisions<br>
6. Revise the prototype preamp for 50 micron SiPMs for gain correction<br>
7. Water cooling: Design and build<br>
<big>'''Parallel to these tasks''':</big><br>
*Study for QM Prelim<br>
*Prepare for the oral exam<br>
*Place-Holder<br>
*Place-Holder<br>