The following is a list of tasks required to get the Ar-F excimer laser online.
 
The following is a list of tasks required to get the Ar-F excimer laser online.
* Tend to the vacuum system: replace oil in diffusion pump, test for
+
* Tend to the vacuum system: replace oil in diffusion pump, test for serious leaks at moderately low pressure (10−6 Torr)
serious leaks at moderately low pressure (10−6 Torr)
   
* Test the RF generator (most expensive/hard to replace!)
 
* Test the RF generator (most expensive/hard to replace!)
 
* Procure a bottle of pure Ar gas
 
* Procure a bottle of pure Ar gas
 
* Flush the tube, turn it on and test output power
 
* Flush the tube, turn it on and test output power
* In case of problems, another group has a system out of commission
+
* In case of problems, another group has a system out of commission and may allow us to salvage pieces. Barring major repair: expected online by end of 2009 with $2-3k
  and may allow us to salvage pieces.
+
Long-term operating goals:
  Barring major repair: expected online by end of 2009 with $2-3k
  −
  Long-term operating goals:
   
* Switch optics to 192nm
 
* Switch optics to 192nm
 
* Get mixture of Ar-F, eventually procure a gas mixing system)
 
* Get mixture of Ar-F, eventually procure a gas mixing system)
 
* Ensure reliable pulse train and consistent power output (±5%)
 
* Ensure reliable pulse train and consistent power output (±5%)