Changes

Jump to navigation Jump to search
Line 12: Line 12:  
* Flush the tube, turn it on and test output power
 
* Flush the tube, turn it on and test output power
 
* In case of problems, another group has a system out of commission
 
* In case of problems, another group has a system out of commission
and may allow us to salvage pieces.
+
  and may allow us to salvage pieces.
Barring major repair: expected online by end of 2009 with $2-3k
+
  Barring major repair: expected online by end of 2009 with $2-3k
Long-term operating goals:
+
  Long-term operating goals:
 
* Switch optics to 192nm
 
* Switch optics to 192nm
 
* Get mixture of Ar-F, eventually procure a gas mixing system)
 
* Get mixture of Ar-F, eventually procure a gas mixing system)
 
* Ensure reliable pulse train and consistent power output (±5%)
 
* Ensure reliable pulse train and consistent power output (±5%)
581

edits

Navigation menu