Changes

Jump to navigation Jump to search
2 bytes removed ,  19:53, 31 May 2018
no edit summary
Line 85: Line 85:  
|}
 
|}
   −
* When a bundle is completed, turn off the fusing unit by turning the two power switches off. Disconnect the hose from the compressor to return the splicing unit to atmospheric pressure.  
+
* When you are done fusing, turn off the fusing unit by turning the two power switches off. Disconnect the hose from the compressor to return the splicing unit to atmospheric pressure.  
    
* The compressor tank should be drained every day after fusing is done. First warn people in the lab that there will be a loud noise from draining the compressor. Then open the bottom valve of the compressor above a container. Air and condensed water residue will escape with a loud hissing sound. Tilt the tank to make sure all the water drains from the tank. Once the pressure in the tank has dropped all the way, close the bottom valve and let the tank refill.
 
* The compressor tank should be drained every day after fusing is done. First warn people in the lab that there will be a loud noise from draining the compressor. Then open the bottom valve of the compressor above a container. Air and condensed water residue will escape with a loud hissing sound. Tilt the tank to make sure all the water drains from the tank. Once the pressure in the tank has dropped all the way, close the bottom valve and let the tank refill.
1,037

edits

Navigation menu