Difference between revisions of "Running ParSA"

From UConn PAN
Jump to navigation Jump to search
Line 13: Line 13:
 
   *Epsilon                0.01
 
   *Epsilon                0.01
  
[[Image:BCF.jpg|A plot of BestCostFunktion versus Step Number]]
+
[[Image:BCF.jpg|thumb|A plot of BestCostFunktion versus Step Number]]

Revision as of 18:38, 30 January 2008

This page will serve as a progress report for the weekly work done on running the ParSA algorithm. Plots of cost function versus step number and the parameters used will be included for each completed run.


Week of 21 January 2008

The goal of the first run was to ensure that the MIR scheduler and solver would be able to successfully complete an entire run.

The parameters used for this run are as follows:

 *Alpha                   0.5
 *Betta                   2
 *endtemperature          0
 *Betta_Runtime           1.1
 *Ebest                   0       
 *Epsilon                 0.01
A plot of BestCostFunktion versus Step Number