Changes

Jump to navigation Jump to search
Line 18: Line 18:  
In Spring 2017 a survey of the various beamline components saw a small change in the Tagger Microscope position. The Microscope (upstream center) position derived from this survey is shown below and includes a magnet center shift from previous measurements.
 
In Spring 2017 a survey of the various beamline components saw a small change in the Tagger Microscope position. The Microscope (upstream center) position derived from this survey is shown below and includes a magnet center shift from previous measurements.
   −
[[Image:TAGM_New_Coord.png|center|thumb|600px|Figure 2: The three coordinate systems often referred to in association with the Tagger Hall. (Image taken from a [https://halldweb.jlab.org/wiki/images/e/e0/TaggerHodoscopeEnergy-1-2017.pdf Dan Sober Presentation])]]
+
[[Image:TAGM_New_Coord.png|center|thumb|600px|Figure 2: Results of a Spring 2017 survey. (Image taken from a [https://halldweb.jlab.org/wiki/images/e/e0/TaggerHodoscopeEnergy-1-2017.pdf Dan Sober Presentation])]]
 
  −
 
  −
[[Image:3DPrinterPic.png|right|thumb|400px|Figure 1: The 3D printer used in lab 419.]]
  −
Text text ([https://docs.google.com/document/d/1TfcPB16d2L3PRFAXlTW4cL5QBGmv2FN2DODGC_htHYE/edit?usp=sharing]) text text.
      
==Next==
 
==Next==
581

edits

Navigation menu