** One worker should tilt the pipe, and the other should remove the top cap and set it aside.
 
** One worker should tilt the pipe, and the other should remove the top cap and set it aside.
 
**While the one worker holds the pipe tilted, the other inserts the bar.  Be careful not to knock the bundle against bars or pipes below the ceiling.  Also, do not let the bar fall into the straightening unit.  Set it carefully at the bottom of the pipe.
 
**While the one worker holds the pipe tilted, the other inserts the bar.  Be careful not to knock the bundle against bars or pipes below the ceiling.  Also, do not let the bar fall into the straightening unit.  Set it carefully at the bottom of the pipe.
 +
 +
{|style="margin: 0 auto;"
 +
| [[File:JK Straightening Pipe 1.JPG|thumb|upright|The heat treating pipe in its vertical position.]]
 +
| [[File:JK Strightening Pipe Bottom.JPG|thumb|upright|The bottom of the heat treating pipe showing the inlet for the thermistor used to measure the temperature in the pipe.]]
 +
| [[File:JK Straightening Pipe Top.JPG|thumb|upright|The top cap of the heat treating pipe unscrewed with valves 7 and 8 labeled.]]
 +
| [[File:JK Straightening Pipe 2.JPG|thumb|upright|The heat treating pipe tilted sufficiently for the aluminum bar holding the fibers to be inserted.]]
 +
|}
 +
 
* Screw the cap back onto the pipe, making sure to hand tighten it.
 
* Screw the cap back onto the pipe, making sure to hand tighten it.
 
* Fill the pipe:
 
* Fill the pipe:
** The valve for the air inlet hose should be closed.
+
** The valve for the air inlet hose (7) should be closed.
 
** Open valves 1, 3, and 6. Close valves 2, 4, and 5.
 
** Open valves 1, 3, and 6. Close valves 2, 4, and 5.
 
** Turn on the cold filtered water, and turn the water inlet valve 90 degrees.   
 
** Turn on the cold filtered water, and turn the water inlet valve 90 degrees.   
 
** When the water starts coming out into the fish tank, open all the valves intermittently to bleed air out.   
 
** When the water starts coming out into the fish tank, open all the valves intermittently to bleed air out.   
** After the air is expelled from the pipes, close all of the valves except for three and two.  
+
** After the air is expelled from the pipes, close all of the valves except for three and two.
 +
 
 +
{|style="margin: 0 auto;"
 +
| [[File:JK Fish Tank.JPG|thumb|upright|The "fish tank" bending unit.]]
 +
| [[File:JK Fishtank Valves.JPG|thumb|upright|Valves one through six in the bending unit.]]
 +
| [[File:JK Fish Tank Valves 2.JPG|thumb|upright|Valves 9 and 10 in the bending unit.]]
 +
|}
 +
 
 
* Run the LabVIEW program to heat the water.  
 
* Run the LabVIEW program to heat the water.  
 
* After the water has reached its maximum temperature it should cool for 12 hours before the aluminum bar is removed from the pipe.   
 