Changes

Jump to navigation Jump to search
no edit summary
Line 28: Line 28:  
* Move 30 rough cut light guides from the intermediate storage box to the table where you will bundle the fibers.
 
* Move 30 rough cut light guides from the intermediate storage box to the table where you will bundle the fibers.
 
* Bundle the light guides into the anchoring collar at one end of the aluminum bar where there are no springs between the collar and the end of the bar.  
 
* Bundle the light guides into the anchoring collar at one end of the aluminum bar where there are no springs between the collar and the end of the bar.  
** Use the bundling tool to arrange the fibers into a 5x6 matrix. Rotate the bundle so that the fibers will fit in the anchoring collar. Screw the upper half of the collar to the lower half, but not too tightly.  You want the fibers to be able to move lengthwise through the collar.  
+
** Use the bundling tool to arrange the fibers into a 5x6 matrix.
 +
**Rotate the bundle so that the fibers will fit in the anchoring collar.
 +
**Screw the upper half of the collar to the lower half, but not too tightly.  You want the fibers to be able to move lengthwise through the collar.  
 
** Use the flat face of a piece of aluminum to align the ends of the fibers so they all project the same distance beyond the anchoring collar, about a half inch.  One worker may hold the metal, while the other pushes the fibers against it. Tighten the anchoring collar around the bundle so it will not slip.
 
** Use the flat face of a piece of aluminum to align the ends of the fibers so they all project the same distance beyond the anchoring collar, about a half inch.  One worker may hold the metal, while the other pushes the fibers against it. Tighten the anchoring collar around the bundle so it will not slip.
   Line 62: Line 64:     
* Insert the aluminum bar into the heat treating pipe.  
 
* Insert the aluminum bar into the heat treating pipe.  
** One worker should tilt the pipe, and the other should remove the top cap and set it aside. While the one worker holds the pipe tilted, the other inserts the bar.  Be careful not to knock the bundle against bars or pipes below the ceiling.  Also, do not let the bar fall into the straightening unit.  Set it carefully at the bottom of the pipe.
+
** One worker should tilt the pipe, and the other should remove the top cap and set it aside.
 
+
**While the one worker holds the pipe tilted, the other inserts the bar.  Be careful not to knock the bundle against bars or pipes below the ceiling.  Also, do not let the bar fall into the straightening unit.  Set it carefully at the bottom of the pipe.
 
* Screw the cap back onto the pipe, making sure to hand tighten it.
 
* Screw the cap back onto the pipe, making sure to hand tighten it.
   
* Fill the pipe:
 
* Fill the pipe:
 
** The valve for the air inlet hose should be closed.
 
** The valve for the air inlet hose should be closed.
** Oven valves 1, 3, and 6. Close valves 2, 4, and 5.
+
** Open valves 1, 3, and 6. Close valves 2, 4, and 5.
** Turn on the cold water filtered water, and turn the water inlet valve 90 degrees.   
+
** Turn on the cold filtered water, and turn the water inlet valve 90 degrees.   
 
** When the water starts coming out into the fish tank, open all the valves intermittently to bleed air out.   
 
** When the water starts coming out into the fish tank, open all the valves intermittently to bleed air out.   
 
** After the air is expelled from the pipes, close all of the valves except for three and two.  
 
** After the air is expelled from the pipes, close all of the valves except for three and two.  
   
* Run the LabVIEW program to heat the water.  
 
* Run the LabVIEW program to heat the water.  
   
* After the water has reached its maximum temperature it should cool for 12 hours before the aluminum bar is removed from the pipe.   
 
* After the water has reached its maximum temperature it should cool for 12 hours before the aluminum bar is removed from the pipe.   
   
* After 12 hours or more, drain the pipe by opening all of the valves, including the one for the air inlet.  
 
* After 12 hours or more, drain the pipe by opening all of the valves, including the one for the air inlet.  
   
* Again, put on clean gloves.
 
* Again, put on clean gloves.
 
+
* One worker should tilt the pipe, and the other should remove the cap and take the bar out of the pipe.
* One worker should tilt the pipe, and the other should remove the cap and take the bar out of the pipe. Replace the cap and raise the pope to its vertical position. Set the bar on the bundling table. Unscrew the collars and remove the straightened bundle. Before putting a new bundle on the aluminum straightening bar, clean the straightened bundle with a damp lint-free cloth, label it, and put it in the intermediate storage box.
+
* Replace the cap and raise the pipe to its vertical position.
 +
* Set the bar on the bundling table.
 +
* Unscrew the collars and remove the straightened bundle.
 +
* Before putting a new bundle on the aluminum straightening bar, clean the straightened bundle with a damp lint-free cloth, label it, and put it in the intermediate storage box.
289

edits

Navigation menu