1. Place-Holder<br>
+
1. Revise the QA Plan<br>
2. Place-Holder<br>
+
2. TDR<br>
 +
3. Beamline paper<br>
 +
4. Offset plate design<br>
 +
5. Generate an equipment list & AutoCAD drawings based on construction plan<br>
 +
    - Dark-box plate (backplane mount)
 +
    - straightening collars (6x6 design?; must stay with plate except during end-milling)
 +
    - bundle collars
 +
    - offset plates
 +
    - chimneys
 +
    - chimney-guides
 +
    - hole locations for base & chimney plates
 +
    - bundle shipping boxes & interior foam
 +
    - gluing block
 +
6. Design testing equipment (bundles & single fibers)<br>
 +
7. Design dark-cloth<br>
 +
7. Build intermediate storage box<br>
 +
5. Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br>
 +
6. Provide mechanical drawings for parts on the equipment list<br>
 +
    - get onto machining list
 +
7. Generate data sheets needed based on construction plan<br>
 +
8. Generate Excel sheets for construction timelines<br>
 +
9. Generate design for gpu cooling system<br>
 +
10. Order: <br>
 +
    - piping components for heat treating fibers
 +
    - components for gpu cooling
 +
    - materials for dark-box
 +
    - stock for: collars, offset plates, chimneys
 +
    - spring-plates
 +
    - springs
 +
    - foam (shipping boxes)
 +
    - cardboard boxes (bundles & spools)
 +
    - hinges (dark-box, storage box)
 +
    - handles (dark-box, storage box)
 +
    - clamps (dark-box, storage box)
 +
    - Velcro, snaps, cloth material
 +
    - mylar for optical box & bundle ends
 +
11. Place-Holder<br>
 +
12. Place-Holder<br>
  
 
<big>'''Parallel to these tasks''':</big><br>
 
<big>'''Parallel to these tasks''':</big><br>
Line 10: Line 46:
 
*Study for QM Prelim<br>
 
*Study for QM Prelim<br>
 
*Prepare for the oral exam<br>
 
*Prepare for the oral exam<br>
*Place-Holder<br>
+
*Workout more<br>
*Place-Holder<br>
 

Revision as of 22:14, 5 October 2012

Main tasks to be accomplished in the near future, as of 9/24/2012:


1. Revise the QA Plan
2. TDR
3. Beamline paper
4. Offset plate design
5. Generate an equipment list & AutoCAD drawings based on construction plan

   - Dark-box plate (backplane mount)
   - straightening collars (6x6 design?; must stay with plate except during end-milling)
   - bundle collars
   - offset plates
   - chimneys
   - chimney-guides
   - hole locations for base & chimney plates
   - bundle shipping boxes & interior foam
   - gluing block

6. Design testing equipment (bundles & single fibers)
7. Design dark-cloth
7. Build intermediate storage box
5. Update the design for the optical enclosure of the tagger microscope to fit the fixed array
6. Provide mechanical drawings for parts on the equipment list

   - get onto machining list

7. Generate data sheets needed based on construction plan
8. Generate Excel sheets for construction timelines
9. Generate design for gpu cooling system
10. Order:

   - piping components for heat treating fibers
   - components for gpu cooling
   - materials for dark-box
   - stock for: collars, offset plates, chimneys
   - spring-plates
   - springs
   - foam (shipping boxes)
   - cardboard boxes (bundles & spools)
   - hinges (dark-box, storage box) 
   - handles (dark-box, storage box)
   - clamps (dark-box, storage box)
   - Velcro, snaps, cloth material
   - mylar for optical box & bundle ends 

11. Place-Holder
12. Place-Holder

Parallel to these tasks:

  • Study for QM Prelim
  • Prepare for the oral exam
  • Workout more