Changes

Jump to navigation Jump to search
275 bytes added ,  19:11, 30 July 2013
m
no edit summary
Line 4: Line 4:  
*Fixing the computer in 405  
 
*Fixing the computer in 405  
 
*Hooking up new NetBooters
 
*Hooking up new NetBooters
*Testing new LabView program
+
*Testing LabView program
 
*Painting one last bit of the dark box
 
*Painting one last bit of the dark box
 
*Converting 3d drawings to 2d drawings for machinist
 
*Converting 3d drawings to 2d drawings for machinist
 
*Redesigning the piping in 405 to accommodate the new heater and pump
 
*Redesigning the piping in 405 to accommodate the new heater and pump
 
*Learning how to use the paint guns, coming up with a concrete method for painting fibers, making a dedicated painting station, and documenting painting trials.
 
*Learning how to use the paint guns, coming up with a concrete method for painting fibers, making a dedicated painting station, and documenting painting trials.
 +
*Ordering new ferrules, and working with Wilmad-Labglass's representative to get a product that would be possible to manufacture while still meeting, or coming close to meeting, our needs. 
 +
*Re-designing the LabVIEW program to be more efficient and to work with a new netbooter
639

edits

Navigation menu