**This may be different since this is a different crate
**This may be different since this is a different crate
*The CPU should have an ethernet cable connecting it to the hub.
*The CPU should have an ethernet cable connecting it to the hub.
+
+
+
== Data Taking ==
+
=== Setup and procedure ===
+
*The former procedure can be found [http://zeus.phys.uconn.edu/wiki/index.php/Fiber_Testing_Procedure here].
+
=== Data Collection/Monitoring ===
+
*This [http://gryphn.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/?newrun link] will request a new run. A new link will likely be used for the new testing.
+
*Check the status of a run [http://gryphn.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/?status here]. This will be updated for the new runs.
+
*Check the cron log [http://gryphn.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/fiberQA_cron.log here]. Once again, this will be changed for the new runs.
+
=== Useful Links ===
+
*The original [https://docs.google.com/a/uconn.edu/spreadsheets/d/1T4NUSQO_keT0QckCx4rWlbMW7Yot4vb-Z1eqrM1l94k/edit#gid=542381648 Fiber QA Google Doc] - credit to Liana Hotte
+
*Check the histograms of the last successful run [http://gryphn.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/ here] - this will need to be updated for the new tests
+
*Check the results of a specific run by modifying the [http://gryphn.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/?run=615 URL] by adding /?run=### to the end of the URL