Changes

Jump to navigation Jump to search
no edit summary
Line 2: Line 2:     
Sasha plans to work on the microscope crate on September 25, 2014. There continues to be a networking issue but Sasha seemed confident that it'll be up and running by the end of the day.
 
Sasha plans to work on the microscope crate on September 25, 2014. There continues to be a networking issue but Sasha seemed confident that it'll be up and running by the end of the day.
 +
 +
On September 25, 2014 the hodoscope counters were removed and the microscope was moved into position. It was placed just after the magnet leg (on the downstream side) and allowed the microscope to be moved into it's correct position. The fibers sit along the focal plane.
321

edits

Navigation menu