Changes

Jump to navigation Jump to search
no edit summary
Line 75: Line 75:  
*Secure both plates to the bar with clamps.
 
*Secure both plates to the bar with clamps.
 
*Repeat the process for placing fibers in the chimney slots. Again starting with the right-most column, and the bottom fiber going into the right-most slot.  Repeat the chimney and tag-removing process.
 
*Repeat the process for placing fibers in the chimney slots. Again starting with the right-most column, and the bottom fiber going into the right-most slot.  Repeat the chimney and tag-removing process.
 +
 +
===Filling the Tank===
 +
*It is important that the water be clean each time a new bundle is put into the water.  As the pieces of the bending unit rust, the water needs to be changed and the tank cleaned each time a new bundle is to be bent.
 +
* Once the tank has been drained and cleaned, open all of the valves near the right exclusion area including the inlet valve from the faucet. 
 +
*Turn on the cold water and let the tank fill. 
 +
*It will take about 30 minutes for the tank to fill high enough to immerse the fibers and bending unit.  Fill the tank until the water reached the top of the highest horizontal 2x4.
639

edits

Navigation menu