Changes

Jump to navigation Jump to search
Line 95: Line 95:     
These implementation will cost less than $15k (chassis, modules, distribution boxes, cables, etc) and it is fully compatible, including controls, with the remaining systems in Hall D. Also note that there is a 12 week lead time so decision is urgent.
 
These implementation will cost less than $15k (chassis, modules, distribution boxes, cables, etc) and it is fully compatible, including controls, with the remaining systems in Hall D. Also note that there is a 12 week lead time so decision is urgent.
 +
 +
* [[media:LV&Bias_Distribution.pdf|LV and bias distribution drawings]]
 +
* [[media:LV&Bias_Chassis.pdf|LV and bias supply and chassis wiring drawings]]
    
== Hamamatsu MPPC SiPMs ==
 
== Hamamatsu MPPC SiPMs ==

Navigation menu