Changes

Jump to navigation Jump to search
no edit summary
Line 36: Line 36:  
* Hold the spool end of the fiber in place with your left hand.  
 
* Hold the spool end of the fiber in place with your left hand.  
 
* Cut the fiber along the notch with the Dremel.
 
* Cut the fiber along the notch with the Dremel.
 +
 +
{|style="margin: 0 auto;"
 +
|[[File:JK Cut Mark.JPG|thumb|upright|The station used to measure and then cut the scintillating fibers.  The lightguide station is an extended version of this.]]
 +
|[[File:JK Lightguide Cutting Station.JPG|thumb|upright|The lightguide cutting station and weight used to hold down fibers.]]
 +
|}
 +
 
* Turn off the Dremel and set it aside.
 
* Turn off the Dremel and set it aside.
 
* Ensure that the clip has the fiber firmly secured in place before letting go of the fiber.   
 
* Ensure that the clip has the fiber firmly secured in place before letting go of the fiber.   
Line 45: Line 51:  
** For SciFi: only one measurement at the center of the 3 cm fiber is required.
 
** For SciFi: only one measurement at the center of the 3 cm fiber is required.
 
** For light guide: align the fiber to the marks indicated on the wood guide and take the required measurements at the points designated by the markings.   
 
** For light guide: align the fiber to the marks indicated on the wood guide and take the required measurements at the points designated by the markings.   
 +
[[File:JK Micrometer.JPG|thumb|upright|The micrometer used to take the cross-sectional dimensions of the fibers.]]
 
* Visually inspect the fiber for damage, paying particular attention to possible
 
* Visually inspect the fiber for damage, paying particular attention to possible
 
** Cracks
 
** Cracks
 
** Cladding flare.
 
** Cladding flare.
 
* If the fiber passes the dimensional limits stated in the specifications document and the visual inspection, place it in the storage box.  
 
* If the fiber passes the dimensional limits stated in the specifications document and the visual inspection, place it in the storage box.  
 +
[[File:JK Intermediate Dark Box.JPG|thumb|upright|Fibers in various stages of production are stored in the intermediate dark box.]]
 
* Fibers that do not pass dimensional inspection are either discarded or kept in a separate location, with non-compliant areas marked with painters' tape.
 
* Fibers that do not pass dimensional inspection are either discarded or kept in a separate location, with non-compliant areas marked with painters' tape.
289

edits

Navigation menu