Changes

Jump to navigation Jump to search
Line 26: Line 26:  
===Relocation of the Active Collimator Station===
 
===Relocation of the Active Collimator Station===
   −
The actcol-station is set up in F117 of the CEBAF building at Jefferson Lab. I have created a [https://halldweb1.jlab.org/wiki/index.php/University_of_Connecticut_Active_Collimator_Station_Tutorial  wiki page] that teaches a user how to operate the station.
+
The actcol-station is set up in F117 of the CEBAF building at Jefferson Lab. I have created a [https://halldweb1.jlab.org/wiki/index.php/University_of_Connecticut_Active_Collimator_Station_Tutorial  '''wiki page'''] that teaches a user how to operate the station.
    
==Data Analysis==
 
==Data Analysis==
 
I have been using the C++ based program ROOT in order to analyze the data obtained from the active collimator.
 
I have been using the C++ based program ROOT in order to analyze the data obtained from the active collimator.
266

edits

Navigation menu