Changes

Jump to navigation Jump to search
Line 39: Line 39:  
On January 10th, Sascha Somov took me to the accelerator site for a tour of the Hall D facility. Below are some pictures I took during the tour. Note that the pictures follow direction of the photon beamline; each successive picture is downstream from the previous picture.
 
On January 10th, Sascha Somov took me to the accelerator site for a tour of the Hall D facility. Below are some pictures I took during the tour. Note that the pictures follow direction of the photon beamline; each successive picture is downstream from the previous picture.
   −
====The "Collimator Cave"====
+
====The "[Collimator Cave]"====
 
<gallery>
 
<gallery>
 
file:jbhd3.jpg|This is where the photon beam first enters Hall D. The tagger hall is 17 meters upstream.  
 
file:jbhd3.jpg|This is where the photon beam first enters Hall D. The tagger hall is 17 meters upstream.  
266

edits

Navigation menu