Changes

Jump to navigation Jump to search
539 bytes added ,  17:44, 23 July 2013
Created page with " From Summer 2012: <gallery> file:Room1.JPG|Preparing for construction. file:Shelving.JPG|Just before the shelving was erected. file:BuildingTank.JPG|Construction of the tank ..."

From Summer 2012:
<gallery>
file:Room1.JPG|Preparing for construction.
file:Shelving.JPG|Just before the shelving was erected.
file:BuildingTank.JPG|Construction of the tank to be used in fiber bending.
file:WaterTest.JPG|Testing the strength of the tank.
file:WaterTest2.JPG|testing...
file:WaterTest3.JPG|Here it is easy to see the bowing from water pressure.
file:FramedWaterTest.JPG|Tank with wooden supports.
file:FramedAndInsulated.JPG|Tank with support and insulation. Plumbing and hot water testing are the next goals.

</gallery>
289

edits

Navigation menu