Line 12: |
Line 12: |
| | | |
| ==Pictures== | | ==Pictures== |
− |
| |
− | From Summer 2012:
| |
− | <gallery>
| |
− | file:Room1.JPG|Preparing for construction.
| |
− | file:Shelving.JPG|Just before the shelving was erected.
| |
− | file:BuildingTank.JPG|Construction of the tank to be used in fiber bending.
| |
− | file:WaterTest.JPG|Testing the strength of the tank.
| |
− | file:WaterTest2.JPG|testing...
| |
− | file:WaterTest3.JPG|Here it is easy to see the bowing from water pressure.
| |
− | file:FramedWaterTest.JPG|Tank with wooden supports.
| |
− | file:FramedAndInsulated.JPG|Tank with support and insulation. Plumbing and hot water testing are the next goals.
| |
− |
| |
− | </gallery>
| |
| | | |
| ==LabView Program== | | ==LabView Program== |