Changes

Jump to navigation Jump to search
Line 12: Line 12:     
==Pictures==
 
==Pictures==
  −
From Summer 2012:
  −
<gallery>
  −
file:Room1.JPG|Preparing for construction.
  −
file:Shelving.JPG|Just before the shelving was erected.
  −
file:BuildingTank.JPG|Construction of the tank to be used in fiber bending.
  −
file:WaterTest.JPG|Testing the strength of the tank.
  −
file:WaterTest2.JPG|testing...
  −
file:WaterTest3.JPG|Here it is easy to see the bowing from water pressure.
  −
file:FramedWaterTest.JPG|Tank with wooden supports.
  −
file:FramedAndInsulated.JPG|Tank with support and insulation. Plumbing and hot water testing are the next goals.
  −
  −
</gallery>
      
==LabView Program==
 
==LabView Program==
289

edits

Navigation menu