Changes

Jump to navigation Jump to search
Line 1: Line 1:  
==Current Work==
 
==Current Work==
   −
* Determine an ideal process to assemble components of the fiber splicing unit.
+
We are currently in full scale construction mode, working full time on building the fiber bundles.  If you want to see our previous construction goals you can access them below.
   −
* Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
+
[[Previous Construction Goals]]
 
  −
* Work with [[User: mcintyre|James McIntyre]] to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
  −
 
  −
* Develop/refine a LabView program that controls a water heater and water pump based on water temperature.
      
==A List of Specifications/Manuals for Items in Lab 405==
 
==A List of Specifications/Manuals for Items in Lab 405==
289

edits

Navigation menu