Changes

Jump to navigation Jump to search
Line 11: Line 11:     
Goals for next week are to start entering digital board revisions into Altium, as well as to attempt to contact Screaming Circuits again.
 
Goals for next week are to start entering digital board revisions into Altium, as well as to attempt to contact Screaming Circuits again.
 +
== Brendan ==
 +
Brendan Pratt:
 +
This week I have been working on the refurbishment of the excimer laser. I have completed the online safety course required by the university and will be taking an eye exam shortly. I have also established a contact with Coherent Inc. technician Jeff Edberg.  Jeff worked on older EMG 101 MSC before the company was bought out by Coherent Inc.  He recommended taking the laser head off and checking a circulating fan for the laser tube. If the motor doesn’t turn then the project would most likely be canceled because it is impossible to find parts. Thursday, I took off the cover of the excimer laser and was able to verify that the motor is working properly. We are now ready to move the laser down to Dr. Barry Wells’ laboratory which I visited this Monday. The lab has the proper exhaust, power supply and water system we will need and all we are waiting for is a table from Dave Perry.
 +
The wiki page has been updated regarding the progress of the laser and of the fiber splicing possibilities. Lastly, I have contacted various camera repair companies in a long shot attempt to gain some information on the Casio ex-f1. I actually received a promising email from Stan Tamarkin saying that he knows the president of Casio. With any luck, he will be able to give us some new information on the layout of the lens system.
581

edits

Navigation menu