Changes

Jump to navigation Jump to search
Line 15: Line 15:  
* Get mixture of Ar-F, eventually procure a gas mixing system)
 
* Get mixture of Ar-F, eventually procure a gas mixing system)
 
* Ensure reliable pulse train and consistent power output (±5%)
 
* Ensure reliable pulse train and consistent power output (±5%)
 +
==Updates==
 +
* Original documentation of the Lambda Physik  EMG 101 MSC Excimer laser has been scanned and posted on the following page,
 +
[http://zeus.phys.uconn.edu/halld/diamonds/emg101refurb/docs EMG 101 Documentation]
 +
* Preparation for moving the Excimer laser has begun.
 +
* Initial diagnostics on the laser's state have also begun, however the real testing begins once we are able to take the laser head cover off.
581

edits

Navigation menu