Changes

Jump to navigation Jump to search
No change in size ,  18:38, 30 January 2008
Line 4: Line 4:  
== Week of 21 January 2008 ==
 
== Week of 21 January 2008 ==
 
The goal of the first run was to ensure that the MIR scheduler and solver would be able to successfully complete an entire run.
 
The goal of the first run was to ensure that the MIR scheduler and solver would be able to successfully complete an entire run.
 +
 +
[[Image:BCF.jpg|thumb|A plot of BestCostFunktion versus Step Number]]
    
The parameters used for this run are as follows:
 
The parameters used for this run are as follows:
Line 12: Line 14:  
   *Ebest                  0       
 
   *Ebest                  0       
 
   *Epsilon                0.01
 
   *Epsilon                0.01
  −
[[Image:BCF.jpg|thumb|A plot of BestCostFunktion versus Step Number]]
 
1,359

edits

Navigation menu