Changes

Jump to navigation Jump to search
m
Removing the warning that the page on the fiber polishing procedure needs updating, since it has been updated.
Line 1: Line 1:  
=Current Work=
 
=Current Work=
 +
==Summer 2017==
 +
This summer, I (Micah Warren) am constructing seven new bundles to replace old ones in the tagger microscope. The following pages provide documentation:
 +
 +
[[Rough Cut Documentation Summer 2017]]
 +
 +
[[Pockmark Documentation Summer 2017]]
 +
 +
==2015 and Earlier==
 
We are currently in production of 12 additional fiber bundles to replace bundles which are currently installed in the microscope. We found that our light guide fibers were not double clad, but were only single clad. In August and September of 2014, we received a new order of BCF-98 and BCF-20 which we verified as multi-clad using [[Cladding Images|EDX techniques]]. In addition to having a second cladding layer, we are also attempting to maintain the optical qualities best by minimizing strain on fibers by removing some of the fiber procedures.  
 
We are currently in production of 12 additional fiber bundles to replace bundles which are currently installed in the microscope. We found that our light guide fibers were not double clad, but were only single clad. In August and September of 2014, we received a new order of BCF-98 and BCF-20 which we verified as multi-clad using [[Cladding Images|EDX techniques]]. In addition to having a second cladding layer, we are also attempting to maintain the optical qualities best by minimizing strain on fibers by removing some of the fiber procedures.  
   Line 5: Line 13:     
=Procedures for Tagger Microscope Construction=
 
=Procedures for Tagger Microscope Construction=
 +
 +
Here is a master document which describes the procedures: [https://docs.google.com/document/d/15OreBfdhb5mdpdXz6KMTVQt8ZWMU-4OV9i8Y6vp97Ms/edit# Construction Plan for the Tagger Microscope]
    
[[Fiber Rough Cut Procedure]]
 
[[Fiber Rough Cut Procedure]]
   −
[[Hot Water Straightening Light Guides Procedure]]<i> Discontinued Jan 2015</i>
+
[[Fiber Numbering Procedure]]
   −
[[Fiber Water Stain Cleaning Procedure]] <i> Discontinued Summer 2014 </i>
+
[[Fiber Measuring Procedure]]
   −
[[End Milling Procedure]]
+
[[Fiber Bundling Procedure]]
   −
[[Fiber Numbering Procedure]]
+
[[End Milling Procedure]] <i> Discontinued Summer 2017 </i>
    
[[Fiber Polishing Procedure]]
 
[[Fiber Polishing Procedure]]
    
[[Fiber Fusing Procedure]]
 
[[Fiber Fusing Procedure]]
 +
 +
[[Temperature Control Program|Hot Air Bending Procedure]]
 +
 +
[[Fiber Testing Procedure]]
 +
 +
[[Hot Water Straightening Light Guides Procedure]]<i> Discontinued Jan 2015</i>
 +
 +
[[Fiber Water Stain Cleaning Procedure]] <i> Discontinued Summer 2014 </i>
    
[[Hot Water Fiber Bending Procedure]] <i> Discontinued Jan 2015 </i>
 
[[Hot Water Fiber Bending Procedure]] <i> Discontinued Jan 2015 </i>
Line 25: Line 43:     
Fiber Gluing Procedure <i> Discontinued Spring 2014 </i>
 
Fiber Gluing Procedure <i> Discontinued Spring 2014 </i>
  −
[[Fiber Testing Procedure]]
      
=A List of Specifications/Manuals for Items in Lab 405=
 
=A List of Specifications/Manuals for Items in Lab 405=
Line 81: Line 97:  
[[Fiber Heating Box]]<br/>
 
[[Fiber Heating Box]]<br/>
 
[[Temperature Control Program]]
 
[[Temperature Control Program]]
 +
 +
=Intermediate Storage Box=
 +
[[Intermediate Storage Box]]
    
=Lab Journals / Research Progress=
 
=Lab Journals / Research Progress=
Line 132: Line 151:     
[[Map of Lab 405]]
 
[[Map of Lab 405]]
 
+
[Out of date as of 6/19/17]
=Light Guide Box=
  −
[[Light Guide Box]]
 
105

edits

Navigation menu