Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  
The tagger microscope was assembled in the Experimental Staging Building (ESB, building 23) at Jefferson Lab during September, 2014. Below are pictures of the assembly process as well as moving the microscope into the hall.
 
The tagger microscope was assembled in the Experimental Staging Building (ESB, building 23) at Jefferson Lab during September, 2014. Below are pictures of the assembly process as well as moving the microscope into the hall.
 
<gallery>
 
<gallery>
 +
tagm-install-9-2014-7.jpg
 +
tagm-install-9-2014-8.jpg
 +
tagm-install-9-2014-9.jpg
 +
tagm-install-9-2014-10.jpg
 +
tagm-install-9-2014-11.jpg
 +
tagm-install-9-2014-12.jpg
 +
tagm-install-9-2014-13.jpg
 +
tagm-install-9-2014-14.jpg
 
tagm-install-9-2014-1.jpg
 
tagm-install-9-2014-1.jpg
 
tagm-install-9-2014-2.jpg
 
tagm-install-9-2014-2.jpg
321

edits

Navigation menu