Changes

Jump to navigation Jump to search
202 bytes added ,  15:03, 20 January 2017
Line 33: Line 33:  
|}
 
|}
   −
*When jobs are submitted to the cluster, Condor will assign resources to jobs to satisfy the resource quotas of the group. If 1000 jobs of each group are submitted, each group should have met its resource quota and the remaining jobs will sit waiting for the next resource.  
+
*When jobs are submitted to the cluster, Condor will assign resources to jobs to satisfy the resource quotas of the group. If 1000 jobs of each group are submitted, each group should have met its resource quota and the remaining jobs will sit waiting for the next resource.
 +
 
 +
*If a group submits more jobs than their quota, the surplus jobs will be regrouped with all other surplus jobs and receiving a resource will be based on user priority, as explained in the next section.
    
*To prevent users from holding onto resources, maximum runtimes are enforced. When a job has gone beyond it's maximum runtime, a job in the queue has the potential to preempt the overtime job.
 
*To prevent users from holding onto resources, maximum runtimes are enforced. When a job has gone beyond it's maximum runtime, a job in the queue has the potential to preempt the overtime job.
191

edits

Navigation menu