Difference between revisions of "February 8, 2013 - February 14, 2013"

From UConn PAN
Jump to navigation Jump to search
m
m
 
Line 6: Line 6:
 
* Have a training checklist (on drive)
 
* Have a training checklist (on drive)
 
* Think of alternate fiber polishing methods (currently using copier paper by hand) Maybe a Dremmel and some buffing pads/copy paper?  We want a nice flat, square polished fiber in the end.
 
* Think of alternate fiber polishing methods (currently using copier paper by hand) Maybe a Dremmel and some buffing pads/copy paper?  We want a nice flat, square polished fiber in the end.
 +
* Attach thermistor to tank, and figure a way to attach the other one to the pipe or close to it.
 +
* Test the LabView program with the thermistor and heater/pump automation.  If there are any bugs, fix them...
 +
* Build ventilation system once all the parts come in
 +
* Cover the UV lights once they come in

Latest revision as of 17:54, 12 February 2013

February 12, 2013

To-Do List for the near future

  • Figure out student schedules
  • Have a training checklist (on drive)
  • Think of alternate fiber polishing methods (currently using copier paper by hand) Maybe a Dremmel and some buffing pads/copy paper? We want a nice flat, square polished fiber in the end.
  • Attach thermistor to tank, and figure a way to attach the other one to the pipe or close to it.
  • Test the LabView program with the thermistor and heater/pump automation. If there are any bugs, fix them...
  • Build ventilation system once all the parts come in
  • Cover the UV lights once they come in