Revision history of "UConn Test Setup"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 18:53, 18 July 2013Gatekeeper talk contribs 4,168 bytes +4,168 Created page with 'In the DAQ crate we are using an old Trigger Interface (TI) board, i.e. the triggers are distributed through front pannels. The SDC board is used for the trigger and clock distr…'