Changes

Jump to navigation Jump to search
no edit summary
Line 38: Line 38:  
Mechanical design of the full-scale tagger microscope is well underway. The design is intended to simplify the repetitive components necessary while maximizing the flexibility of the device. In particular, the drastic dependence of the electron crossing angle with energy has been taken account: the device will have the ability for orientation of its fiber modules to match any segment in the useful energy range.
 
Mechanical design of the full-scale tagger microscope is well underway. The design is intended to simplify the repetitive components necessary while maximizing the flexibility of the device. In particular, the drastic dependence of the electron crossing angle with energy has been taken account: the device will have the ability for orientation of its fiber modules to match any segment in the useful energy range.
 
Additionally a movable internal pulser for testing and a three-point remote-control-adjustable plane for the fiber array are under design.
 
Additionally a movable internal pulser for testing and a three-point remote-control-adjustable plane for the fiber array are under design.
 +
 +
    
== Beam Test in Hall B at Jefferson Lab ==
 
== Beam Test in Hall B at Jefferson Lab ==
Line 43: Line 45:  
The ideal place to test the prototype is near another tagger magnet such as the one in Hall B.  Thus the plan is to set the prototype downstream of Hall B's hodoscope.   
 
The ideal place to test the prototype is near another tagger magnet such as the one in Hall B.  Thus the plan is to set the prototype downstream of Hall B's hodoscope.   
   −
[http://zeus.phys.uconn.edu/~senderovich/GlueX/Tagger/Reports/MicroscopeBeamTest_plan-2-2010/MicroscopeBeamTest_plan-2-2010.pdf Beam Test Plan]
+
* [http://zeus.phys.uconn.edu/~senderovich/GlueX/Tagger/Reports/MicroscopeBeamTest_plan-2-2010/MicroscopeBeamTest_plan-2-2010.pdf Beam Test Plan]
 +
* [[Delivery of the Tagger Microscope Prototype to JLab]] - [[User: mcintyre|James McIntyre]]
 +
* [https://docs.google.com/document/pub?id=1yC9U8ufcUvTR00vY2vNM_G78fwLKALBip3E1Zsic1R4&embedded=true Spring 2011 Beam Test of Tagger Microscope Prototype] - online logbook
 +
 
    
== References ==
 
== References ==
** [[Microscope Prototype Mechanical Design Drawings]] - [[User: mcintyre|James McIntyre]]
+
* [[Microscope Prototype Mechanical Design Drawings]] - [[User: mcintyre|James McIntyre]]
 
  −
[[User:Senderovich|Igor Senderovich]] 21:31, 22 March 2010 (UTC)
 

Navigation menu