Changes

Jump to navigation Jump to search
Line 43: Line 43:  
The ideal place to test the prototype is near another tagger magnet such as the one in Hall B.  Thus the plan is to set the prototype downstream of Hall B's hodoscope.   
 
The ideal place to test the prototype is near another tagger magnet such as the one in Hall B.  Thus the plan is to set the prototype downstream of Hall B's hodoscope.   
   −
[http://zeus.phys.uconn.edu/~senderovich/GlueX/Tagger/Reports/MicroscopeBeamTest_plan-2-2010/MicroscopeBeamTest_plan-2-2010.pdf Beam Test Plan]
+
* [http://zeus.phys.uconn.edu/~senderovich/GlueX/Tagger/Reports/MicroscopeBeamTest_plan-2-2010/MicroscopeBeamTest_plan-2-2010.pdf Beam Test Plan]
 +
* [[Delivery of the Tagger Microscope Prototype to JLab]] - [[User: mcintyre|James McIntyre]]
 +
* [https://docs.google.com/document/d/1yC9U8ufcUvTR00vY2vNM_G78fwLKALBip3E1Zsic1R4/edit?hl=en_US&authkey=CO_5ofAC Spring 2011 Beam Test of
 +
Tagger Microscope Prototype - online logbook]
    
== References ==
 
== References ==
 
* [[Microscope Prototype Mechanical Design Drawings]] - [[User: mcintyre|James McIntyre]]
 
* [[Microscope Prototype Mechanical Design Drawings]] - [[User: mcintyre|James McIntyre]]

Navigation menu