Changes

Jump to navigation Jump to search
m
no edit summary
Line 44: Line 44:     
Preparations for testing the tagger microscope in a live beam are underway. The ideal place to test the prototype is near another tagger magnet such as the one in Hall B. Thus the plan is to set the prototype downstream of Hall B's hodoscope.   
 
Preparations for testing the tagger microscope in a live beam are underway. The ideal place to test the prototype is near another tagger magnet such as the one in Hall B. Thus the plan is to set the prototype downstream of Hall B's hodoscope.   
 +
 +
[http://zeus.phys.uconn.edu/~senderovich/GlueX/Tagger/Reports/MicroscopeBeamTest_plan-2-2010/MicroscopeBeamTest_plan-2-2010.pdf Beam Test Plan]
       
[[User:Senderovich|Igor Senderovich]] 21:31, 22 March 2010 (UTC)
 
[[User:Senderovich|Igor Senderovich]] 21:31, 22 March 2010 (UTC)
1,004

edits

Navigation menu