Line 3: Line 3:  
Sasha plans to work on the microscope crate on September 25, 2014. There continues to be a networking issue but Sasha seemed confident that it'll be up and running by the end of the day.
 
Sasha plans to work on the microscope crate on September 25, 2014. There continues to be a networking issue but Sasha seemed confident that it'll be up and running by the end of the day.
   −
On September 25, 2014 the hodoscope counters were removed and the microscope was moved into position. The fibers are not situated along the focal plane.
+
On September 25, 2014 the hodoscope counters were removed and the microscope was moved into position. The fibers are not situated along the focal plane. [Edit:Alex Barnes] The initial positioning of the microscope was wrong. The microscope has been moved to where it should be and everything fits.
 +
 
 +
On September 26, 2014 the hodoscope counters have been placed back. This involved removing the wheels from the base of the microscope and lowering the entire enclosure because the hodoscope counters did not fit over the bar holding the fibers down after the S-bend. We will worry about the proper adjustment of the fibers when survey and alignment come on Wednesday.
321