Changes

Jump to navigation Jump to search
Line 33: Line 33:  
==Spring 2009 Updates==
 
==Spring 2009 Updates==
 
I am very excited that as of 27 January we have finally ordered the aluminum metal for the tagger box! Working with the lab group and the UConn Physics machine shop, I hope to have the prototype box assembled by early February. I will hopefully post pictures as soon as construction begins.
 
I am very excited that as of 27 January we have finally ordered the aluminum metal for the tagger box! Working with the lab group and the UConn Physics machine shop, I hope to have the prototype box assembled by early February. I will hopefully post pictures as soon as construction begins.
 +
 +
As of 5 February, I am working closely with the UConn Physics machine shop to both create the tagger box and learn the CNC machining tools necessary to complete such construction work with minimal assistance in the future. The machine shop is busy with another project right now, but we will begin making the box late this week (week of 2/9-2/13) and early next week.
58

edits

Navigation menu