I am very excited that as of 27 January we have finally ordered the aluminum metal for the tagger box! Working with the lab group and the UConn Physics machine shop, I hope to have the prototype box assembled by early February. I will hopefully post pictures as soon as construction begins. | I am very excited that as of 27 January we have finally ordered the aluminum metal for the tagger box! Working with the lab group and the UConn Physics machine shop, I hope to have the prototype box assembled by early February. I will hopefully post pictures as soon as construction begins. |