Previous Construction Goals

From UConn PAN
Revision as of 17:32, 23 July 2013 by Jonathank (talk | contribs) (Created page with "* Determine an ideal process to assemble components of the fiber splicing unit. * Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fib...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Determine an ideal process to assemble components of the fiber splicing unit.
  • Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
  • Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
  • Develop/refine a LabView program that controls a water heater and water pump based on water temperature.