Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1: −
= Microscope Installation Pictures =
  −
   
The tagger microscope was assembled in the Experimental Staging Building (ESB, building 23) at Jefferson Lab during September, 2014. Below are pictures of the assembly process as well as moving the microscope into the hall.
 
The tagger microscope was assembled in the Experimental Staging Building (ESB, building 23) at Jefferson Lab during September, 2014. Below are pictures of the assembly process as well as moving the microscope into the hall.
 +
<gallery>
 +
tagm-install-9-2014-7.jpg
 +
tagm-install-9-2014-8.jpg
 +
tagm-install-9-2014-9.jpg
 +
tagm-install-9-2014-10.jpg
 +
tagm-install-9-2014-11.jpg
 +
tagm-install-9-2014-12.jpg
 +
tagm-install-9-2014-13.jpg
 +
tagm-install-9-2014-14.jpg
 +
tagm-install-9-2014-1.jpg
 +
tagm-install-9-2014-2.jpg
 +
tagm-install-9-2014-3.jpg
 +
tagm-install-9-2014-4.jpg
 +
tagm-install-9-2014-5.jpg
 +
tagm-install-9-2014-6.jpg
 +
</gallery>
321

edits

Navigation menu