Changes

Jump to navigation Jump to search
Line 122: Line 122:  
*Do not push the preamps all the way against the eurocard. Use the chimney bracket brace bar to push the preamp onto the eurocard. Simply attach the bar and tighten the bolts. The preamp will be properly located with respect to the chimney slots.
 
*Do not push the preamps all the way against the eurocard. Use the chimney bracket brace bar to push the preamp onto the eurocard. Simply attach the bar and tighten the bolts. The preamp will be properly located with respect to the chimney slots.
    +
=== Controlling the electronics ===
 +
See [https://docs.google.com/document/d/1h_cdGmiCDNpebsxfTyXRY9JQlQd3d6N6BcufDAcAnWU/edit this Google doc] for information pertaining to the electronics software and proper usage.
    
== JLab Crate Setup ==
 
== JLab Crate Setup ==
Line 144: Line 146:  
**This may be different since this is a different crate
 
**This may be different since this is a different crate
 
*The CPU should have an ethernet cable connecting it to the hub.
 
*The CPU should have an ethernet cable connecting it to the hub.
 +
 +
=== Setting up the crate for testing ===
 +
*The crate will need to be connected to our network (ask Richard)
 +
*The gate will need to be configured.
 +
*CODA will require configuration files in order to run properly
    
== Testing the setup ==
 
== Testing the setup ==
321

edits

Navigation menu