Construction of the Full-Scale Tagger Microscope

From UConn PAN
Jump to navigation Jump to search

Preparations for Construction of the Full-Scale Tagger Microscope

Current Work

  • Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
    • Determine an ideal process to assemble components of the fiber splicing unit.
  • Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.


A List of Specifications/Manuals for Products in Use in the Lab

Data Acquisition Hardware

Three way sweat valve

Black Silicone Adhesive (RTV)

Ultra Black Silicone Adhesive (gasket maker)

Polystyrene

Water Pump

Water Heater

Completed Work

  • Clean and organize room P405.
  • Help assemble equipment to be used in the manufacture of optical bundles for the tagger microscope.


Pictures