Difference between revisions of "Construction of the Full-Scale Tagger Microscope"

From UConn PAN
Jump to navigation Jump to search
Line 3: Line 3:
  
 
==Current Work==
 
==Current Work==
 +
 +
* Determine an ideal process to assemble components of the fiber splicing unit.
  
 
* Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
 
* Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
** Determine an ideal process to assemble components of the fiber splicing unit.
 
  
 
* Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
 
* Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
 
  
 
==A List of Specifications/Manuals for Items in Lab 405==
 
==A List of Specifications/Manuals for Items in Lab 405==

Revision as of 16:30, 28 November 2012

Preparations for Construction of the Full-Scale Tagger Microscope

Current Work

  • Determine an ideal process to assemble components of the fiber splicing unit.
  • Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
  • Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.

A List of Specifications/Manuals for Items in Lab 405

Data Acquisition Hardware

Net Booter Quick Start Pamphlet

Net Booter User Manual

Water Pump

Water Heater

Three way sweat valve

Black Silicone Adhesive (RTV)

Ultra Black Silicone Adhesive (gasket maker)

Polystyrene

Completed Work

  • Clean and organize room P405.
  • Help assemble equipment to be used in the manufacture of optical bundles for the tagger microscope.


Pictures

From Summer 2012: