Difference between revisions of "Construction of the Full-Scale Tagger Microscope"

From UConn PAN
Jump to navigation Jump to search
Line 9: Line 9:
 
* Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
 
* Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.
  
 +
 +
==A List of Specifications for Products We Use==
  
 
==Completed Work==
 
==Completed Work==

Revision as of 20:07, 26 November 2012

Preparations for Construction of the Full-Scale Tagger Microscope

Current Work

  • Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
    • Determine an ideal process to assemble components of the fiber splicing unit.
  • Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.


A List of Specifications for Products We Use

Completed Work

  • Clean and organize room P405.
  • Help assemble equipment to be used in the manufacture of optical bundles for the tagger microscope.


Pictures