Difference between revisions of "Construction of the Full-Scale Tagger Microscope"

From UConn PAN
Jump to navigation Jump to search
Line 21: Line 21:
 
==Pictures==
 
==Pictures==
  
* Summer 2012  
+
* [https://docs.google.com/document/d/1fXlfKReWkKNrl8luj85XU-ee59uSU631ode7-usL80I/edit Summer 2012]
 
* Fall 2012   
 
* Fall 2012   
 
'''
 
'''

Revision as of 19:07, 19 October 2012

Preparations for Construction of the Full-Scale Tagger Microscope

Current Work

  • Optimize and document a reliable, repeatable process for fusing 2mm x 2mm square optical fibers using a fiber splicing unit.
    • Determine an ideal process to assemble components of the fiber splicing unit.
  • Work with James McIntyre to develop polishing, gluing, painting, and quality assurance procedures for optical fibers.



Completed Work

  • Clean and organize room P405.
  • Help assemble equipment to be used in the manufacture of optical bundles for the tagger microscope.


Pictures