==Summer 2017==
 +
This summer, I (Micah Warren) am constructing seven new bundles to replace old ones in the tagger microscope. The following pages provide documentation:
 +
 +
[[Rough Cut Documentation Summer 2017]]
 +
 +
[[Pockmark Documentation Summer 2017]]
 +
 +
==2015 and Earlier==
 
We are currently in production of 12 additional fiber bundles to replace bundles which are currently installed in the microscope. We found that our light guide fibers were not double clad, but were only single clad. In August and September of 2014, we received a new order of BCF-98 and BCF-20 which we verified as multi-clad using [[Cladding Images|EDX techniques]]. In addition to having a second cladding layer, we are also attempting to maintain the optical qualities best by minimizing strain on fibers by removing some of the fiber procedures.  
 
We are currently in production of 12 additional fiber bundles to replace bundles which are currently installed in the microscope. We found that our light guide fibers were not double clad, but were only single clad. In August and September of 2014, we received a new order of BCF-98 and BCF-20 which we verified as multi-clad using [[Cladding Images|EDX techniques]]. In addition to having a second cladding layer, we are also attempting to maintain the optical qualities best by minimizing strain on fibers by removing some of the fiber procedures.  
   Line 5: Line 13:     
=Procedures for Tagger Microscope Construction=
 
=Procedures for Tagger Microscope Construction=
 +
 +
Here is a master document which describes the procedures: [https://docs.google.com/document/d/15OreBfdhb5mdpdXz6KMTVQt8ZWMU-4OV9i8Y6vp97Ms/edit# Construction Plan for the Tagger Microscope]
    
[[Fiber Rough Cut Procedure]]
 
[[Fiber Rough Cut Procedure]]
   −
[[Hot Water Straightening Light Guides Procedure]]<i> Discontinued Jan 2015</i>
+
[[Fiber Numbering Procedure]]
 +
 
 +
[[Fiber Measuring Procedure]]
   −
[[Fiber Water Stain Cleaning Procedure]] <i> Discontinued Summer 2014 </i>
+
[[Fiber Bundling Procedure]]
   −
[[End Milling Procedure]]
+
[[End Milling Procedure]] <i> Discontinued Summer 2017 </i>
    
[[Fiber Polishing Procedure]]
 
[[Fiber Polishing Procedure]]
    
[[Fiber Fusing Procedure]]
 
[[Fiber Fusing Procedure]]
 +
 +
[[Temperature Control Program|Hot Air Bending Procedure]]
 +
 +
[[Fiber Testing Procedure]]
 +
 +
[[Hot Water Straightening Light Guides Procedure]]<i> Discontinued Jan 2015</i>
 +
 +
[[Fiber Water Stain Cleaning Procedure]] <i> Discontinued Summer 2014 </i>
    
[[Hot Water Fiber Bending Procedure]] <i> Discontinued Jan 2015 </i>
 
[[Hot Water Fiber Bending Procedure]] <i> Discontinued Jan 2015 </i>
Line 23: Line 43:     
Fiber Gluing Procedure <i> Discontinued Spring 2014 </i>
 
Fiber Gluing Procedure <i> Discontinued Spring 2014 </i>
  −
[[Fiber Testing Procedure]]
      
=A List of Specifications/Manuals for Items in Lab 405=
 
=A List of Specifications/Manuals for Items in Lab 405=
Line 30: Line 48:  
This page has the documentation for the various procedures and pieces of equipment that are used in the bending tank, the splicing unit, and elsewhere in 405.
 
This page has the documentation for the various procedures and pieces of equipment that are used in the bending tank, the splicing unit, and elsewhere in 405.
 
[[Documents for 405]]
 
[[Documents for 405]]
 +
 +
 +
=Fiber Statistics=
 +
 +
[[Fiber Dimension Statistics]]
 +
    
=Miscellaneous Fiber Testing=
 
=Miscellaneous Fiber Testing=
Line 60: Line 84:  
*[http://halldweb1.jlab.org/wiki/index.php/Private:UConn_test_setup Alex Somov's instructions for running the CODA-based DAQ]
 
*[http://halldweb1.jlab.org/wiki/index.php/Private:UConn_test_setup Alex Somov's instructions for running the CODA-based DAQ]
 
*[[media:Jlab_VME_discriminatorRevD_manual.pdf|VME discriminator manual]]
 
*[[media:Jlab_VME_discriminatorRevD_manual.pdf|VME discriminator manual]]
*[[media:FADC250UsersManual.pdf|VME FADC250 manual]] ([[media:FADC250_V2_ADC_FPGA_V90E.pdf|latest firmware update]])
+
*[[media:FADC250UsersManual.pdf|VME FADC250 manual]] ([[media:FADC250_V2_ADC_FPGA_V90E.pdf|firmware update 90E]], [[media:FADC250_Processing_FPGA_Firmware_ver_0x0C01.pdf|firmware update C01]])
*[[media:Jlab_F1_TDC_manual.pdf|VME F1TDC manual]]
+
*[[media:Jlab_F1_TDC_manual.pdf|VME F1TDC manual]] ([[media:F1TDC_V2_V3_8_26.pdf|latest firmware update]])
 
*[[media:CaenADCv792_rev18.pdf|Caen QDC v792 manual]]
 
*[[media:CaenADCv792_rev18.pdf|Caen QDC v792 manual]]
 
*[[media:TI-old-VME.pdf|VME Trigger Interface (old-style VME) manual]]
 
*[[media:TI-old-VME.pdf|VME Trigger Interface (old-style VME) manual]]
Line 73: Line 97:  
[[Fiber Heating Box]]<br/>
 
[[Fiber Heating Box]]<br/>
 
[[Temperature Control Program]]
 
[[Temperature Control Program]]
 +
 +
=Intermediate Storage Box=
 +
[[Intermediate Storage Box]]
    
=Lab Journals / Research Progress=
 
=Lab Journals / Research Progress=
Line 124: Line 151:     
[[Map of Lab 405]]
 
[[Map of Lab 405]]
 +
[Out of date as of 6/19/17]
105