Fiber QA Troubleshooting

From UConn PAN
Revision as of 18:10, 14 July 2014 by Liana (talk | contribs)
Jump to navigation Jump to search

Troubleshooting of the QA Procedure required many runs and a few weeks. The results of those runs were motivations for changes to the testing procedure including: modification to the pulser circuit, modification to the pulser power source, standardized methods of placing the fibers into the chimneys, and consideration of temperature in analyzing photon yield. The results of these preliminary tests can be found below:


Previous Procedures

  • Metal clamps and wires were previously used to secure the bundles of 15 to the fibers' popsicle sticks. We then graduated to using only one metal clamp over two 15-fiber bundles and two kapton strips per popsicle stick.
 
The popsicle stick with clamp and wires to hold the fibers in place.
  • We are currently working on making the paper spacings procedure easier.
 
A view of 15 flush fibers separated with paper spacers between each row and column.
  • The following photos were taken before the pulser circuit was fixed (added around June 16th) and before the pulser ran on a power supply. The pulser was modified to run on a power supply on July 3rd, 2014. You can see the results of this change on the "Scramble on Power Supply" page of the Fiber QA Troubleshooting Google Doc
 
Image of the fibers, mirror and pulsar from the main opening of the dark box.
 
Image of the fibers, mirror and pulsar from along the fibers.
 
View of the fibers from the main opening of the dark box. Black plastic separates the scintillating fiber end and pulsar from the chimneys and SciPMs.