Line 30: Line 30:  
* Once the power supply, main exhaust, water supply, and gases are installed properly, we will pressurize the system with helium and check for leaks as well as test the HV power supply.
 
* Once the power supply, main exhaust, water supply, and gases are installed properly, we will pressurize the system with helium and check for leaks as well as test the HV power supply.
 
==Updates for January 2010==
 
==Updates for January 2010==
* All safety classes and eye exams have been taken, the [[Media:S.O.P.|S.O.P.]] is nearly ready for filing.
+
* All safety classes and eye exams have been taken, the [[Media:S.O.P.doc|S.O.P.]] is nearly ready for filing.
 
* The laser has been transferred to Dr. Barry Wells' lab and placed on a reinforced table.
 
* The laser has been transferred to Dr. Barry Wells' lab and placed on a reinforced table.
 
* The main exhaust and vacuum pump exhaust are installed.
 
* The main exhaust and vacuum pump exhaust are installed.