11/19: We are keeping the KBM in the tall computer rack in P-405. The computers, which will be surplused, can just slide out of the rack.  
 
11/19: We are keeping the KBM in the tall computer rack in P-405. The computers, which will be surplused, can just slide out of the rack.  
  
We need to check the UPS units in the rack in P-403. Some of them are bad. They are either turned off or constantly blinking.
+
We need to check the UPS units in the rack in P-403. Some of them are bad. They are either turned off or constantly blinking. The batteries need to be replaced.

Revision as of 19:52, 19 November 2018

11/1: After dark box run 1837, I opened the dark box but noticed that the curtain was not closed all the way. There was an opening at the bottom. I closed the dark box and did some more normalization tests for step 21.

11/6: I put the CAMMA User Agreement page in the top right desk drawer in 403.

11/19: We are keeping the KBM in the tall computer rack in P-405. The computers, which will be surplused, can just slide out of the rack.

We need to check the UPS units in the rack in P-403. Some of them are bad. They are either turned off or constantly blinking. The batteries need to be replaced.