(Created page with "9/6: Jim replaced the RBC55 UPS batteries. There were four replacement batteries. He took out the old battery cartridges but had to keep the connections and covers for them to...")
 
Line 1: Line 1:
9/6: Jim replaced the RBC55 UPS batteries. There were four replacement batteries. He took out the old battery cartridges but had to keep the connections and covers for them to use on the new batteries. The new batteries just had to be screwed together and wired the same way the old ones were. Jim put packing tape around them to hold them together. There was a piece of foam that may have been between the old cartridges. Now it is between the new batteries.
+
9/6: Jim replaced the RBC55 UPS batteries for the [https://www.schneider-electric.com/en/product/SUA2200_APC/apc-smart-ups-2200va-usb-%26-serial-120v APC SUA2200]. There were four replacement batteries. He took out the old battery cartridges but had to keep the connections and covers for them to use on the new batteries. The new batteries just had to be screwed together and wired the same way the old ones were. Jim put packing tape around them to hold them together. There was a piece of foam that may have been between the old cartridges. Now it is between the new batteries.

Revision as of 20:51, 6 September 2018

9/6: Jim replaced the RBC55 UPS batteries for the APC SUA2200. There were four replacement batteries. He took out the old battery cartridges but had to keep the connections and covers for them to use on the new batteries. The new batteries just had to be screwed together and wired the same way the old ones were. Jim put packing tape around them to hold them together. There was a piece of foam that may have been between the old cartridges. Now it is between the new batteries.