Changes

Jump to navigation Jump to search
Line 65: Line 65:  
|-
 
|-
 
|}
 
|}
 +
*The system has been pressurized to 2200mbar (operating pressure) and will be checked again within 24hrs to obtain the leak rate. If found to be less than 5mbar/hr the system will be reconstructed and tested for light output after the new window is received.
581

edits

Navigation menu