Changes

Jump to navigation Jump to search
Line 32: Line 32:  
* Once the power supply, main exhaust, water supply, and gases are installed properly, we will pressurize the system with helium and check for leaks as well as test the HV power supply.
 
* Once the power supply, main exhaust, water supply, and gases are installed properly, we will pressurize the system with helium and check for leaks as well as test the HV power supply.
 
*  The following photos are of the inside of the Lambda Physik EMG 101 MSC Excimer Laser.
 
*  The following photos are of the inside of the Lambda Physik EMG 101 MSC Excimer Laser.
Image:excimer_laser_inside.jpg|thumb|117px|Lin
+
[[Image:excimer_laser_inside.jpg|300px]]
581

edits

Navigation menu